Constarium
← Search

Data · dataset · 2025

An Agent-Based Approach for Scheduling Multiple Machines

Listed in Borealis

We present a new agent-based solution approach for the problem of scheduling multiple non-identical machines in the face of sequence dependent setups, job machine restrictions, batch size preferences, fixed costs of assigning jobs to machines and downstream considerations.

Description

We consider multiple objectives such as minimizing (weighted) earliness and tardiness, and minimizing job-machine assignment costs. We use an agent-based architecture called Asynchronous Team (A-Team), in which each agent encapsulates a different problem solving strategy and agents cooperate by exchanging results.

Computational experiments on large instances of real-world scheduling problems show that the results obtained by this approach are significantly better than any single algorithm or the scheduler alone. This approach has been successfully implemented in an industrial scheduling system.

Links

Where it is published

Catalogue records · 1

Topics

Stated by source
Engineering
From keywords
Engineering
Provenance · 1 source records, 8 field assertions
SourceKeyLast seenRaw
Borealisdoi:10.5683/SP3/UMZODX11 d agoJSON v1
FieldAssertionExtractorEvidence
concepts[field].dataverse_subject:engineeringsource · borealisdata caconnector:borealisdata_ca@1.0.0/subjects
concepts[field].local:field:engineeringmapping · borealisdata caconnector:borealisdata_ca@1.0.0/subjects
created_datesource · borealisdata caconnector:borealisdata_ca@1.0.0
descriptionsource · borealisdata caconnector:borealisdata_ca@1.0.0/description
publication_datesource · borealisdata caconnector:borealisdata_ca@1.0.0
titlesource · borealisdata caconnector:borealisdata_ca@1.0.0/name
updated_datesource · borealisdata caconnector:borealisdata_ca@1.0.0
version_labelsource · borealisdata caconnector:borealisdata_ca@1.0.0