Constarium
← Search

Data · dataset · 2025

CLEM1-LUN/EAR/SKY-ASTAR/BSTAR/UVVIS/HRES/LWIR/NIR-2-EDR-V1.0

Listed in NASA Data Portal

The Clementine EDR (Engineering Data Record) Image Archive contains 88 CD-ROM volumes with more than 1.9 million images.

Description

Each volume contains approximately 3 lunar orbits but may vary in the number of orbits depending on the size of each orbit. The first volume in the set begins with orbit number 32--the start of the systematic lunar mapping phase of the mission.

The image data products for the engineering checkout and operational rehearsal orbits (orbits 1-31), low Earth orbits, and earth phasing loop orbits are located on the last eight volumes at the end of the volume set.

Links

Topics

Inferred from text
Image 75%

Related

Provenance · 1 source records, 7 field assertions
SourceKeyLast seenRaw
NASA Data Portal0dc6f97f-fd83-405a-8c0f-f9d9315f199911 d agoJSON v1
FieldAssertionExtractorEvidence
concepts[modality].local:modality:imageenrichment · data nasa govkeyword-concept-rules@1.0.0title+description (75%)
created_datesource · data nasa govconnector:data_nasa_gov@1.0.0
descriptionsource · data nasa govconnector:data_nasa_gov@1.0.0/notes
license_textsource · data nasa govconnector:data_nasa_gov@1.0.0
publication_datesource · data nasa govconnector:data_nasa_gov@1.0.0
titlesource · data nasa govconnector:data_nasa_gov@1.0.0/title
updated_datesource · data nasa govconnector:data_nasa_gov@1.0.0