Constarium
← Search

Data · dataset · 2016

Wilmeth Active Learning Center Building Construction Time-Lapse, August 2014–September 2016

Listed in DataCite

Description

<p>[[Video(youtube.com/watch?v=JajjmZ6NfUI)]]</p> <p>The Thomas S. and Harvey D. Wilmeth Active Learning Center is scheduled to open in the fall of 2017.&nbsp; The 164,000 SF, $79M design-bid-build project has 26 active learning classrooms and a central library that consolidates 6 campus libraries.&nbsp; The facility is located in the heart of campus with an atrium and reading room that overlooks the Bell Tower.&nbsp;</p> <p>This video was assembled from cameras located on the MATH building for the period of August 2014 to September 2016.</p> <p>The full data collection can be found at dx.doi.org/10.4231/R70P0WXD.</p>

Links

Topics

Stated by source
Civil engineering
Inferred from text
Heart 75% · Video 75%
Provenance · 1 source records, 10 field assertions
SourceKeyLast seenRaw
DataCite10.4231/r75b00d112 d agoJSON v1
FieldAssertionExtractorEvidence
access_levelsource · DataCiteconnector:datacite@1.0.0/data/attributes/rightsList
byte_sizesource · DataCiteconnector:datacite@1.0.0
concepts[anatomy].local:anatomy:heartenrichment · DataCitekeyword-concept-rules@1.0.0title+description (75%)
concepts[field].fos:civil-engineeringsource · DataCiteconnector:datacite@1.0.0
concepts[modality].local:modality:videoenrichment · DataCitekeyword-concept-rules@1.0.0title+description (75%)
descriptionsource · DataCiteconnector:datacite@1.0.0/data/attributes/descriptions
licensesource · DataCiteconnector:datacite@1.0.0/data/attributes/rightsList
publication_datesource · DataCiteconnector:datacite@1.0.0/data/attributes/dates
titlesource · DataCiteconnector:datacite@1.0.0/data/attributes/titles/0/title
version_labelsource · DataCiteconnector:datacite@1.0.0