Constarium
← Search

Data · dataset · 2025

Adaptive hybrid optimization for integrated project scheduling and staffing problem with time/resource trade-offs

Listed in Borealis

• Proposes a dual-objective optimization model for the Integrated

Description

Project

Scheduling and Personnel Staffing Problem (IPSPSP) with time/resource trade-offs. •Introduces an adaptive hybrid algorithm combining NSGA-II and MOPSO to optimize project duration and personnel cost. •Utilizes hybrid encoding for activity modes, activity priority lists, and personnel allocation plans to generate project schedules and personnel allocation plans. •Employs a hypervolume-based adaptive search mechanism to improve solution quality. •Experimental results show the proposed hybrid algorithm outperforms standalone NSGA-II and MOPSO in scheduling and resource optimization.

Links

Where it is published

Catalogue records · 1

Topics

Stated by source
Engineering
From keywords
Engineering
Inferred from text
Manufacturing engineering 68%
Provenance · 1 source records, 9 field assertions
SourceKeyLast seenRaw
Borealisdoi:10.5683/SP3/KJXO1D10 d agoJSON v1
FieldAssertionExtractorEvidence
concepts[field].anzsrc:group:4014enrichment · borealisdata cataxonomy-embedding@1.1.0title+keywords+description (68%)
concepts[field].dataverse_subject:engineeringsource · borealisdata caconnector:borealisdata_ca@1.0.0/subjects
concepts[field].local:field:engineeringmapping · borealisdata caconnector:borealisdata_ca@1.0.0/subjects
created_datesource · borealisdata caconnector:borealisdata_ca@1.0.0
descriptionsource · borealisdata caconnector:borealisdata_ca@1.0.0/description
publication_datesource · borealisdata caconnector:borealisdata_ca@1.0.0
titlesource · borealisdata caconnector:borealisdata_ca@1.0.0/name
updated_datesource · borealisdata caconnector:borealisdata_ca@1.0.0
version_labelsource · borealisdata caconnector:borealisdata_ca@1.0.0