← Search

Data · dataset · 2016

Bridge Beam Placement US 31 and 169th Street

Listed in DataCite

Description

<p>[[Video(youtube.com/watch?v=SHd3CEbgkF0)]]</p> <p>The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. Construction on the bridge began in May 2015 and was complete by October 2015, while the overall project was substantially complete by December 2015.

This video shows construction crews placing the precast concrete bridge beams for the bridge over 169<span style="font-size:10.6667px">th</span>&nbsp;Street.</p> <p>The project is located at <a href="google.com/maps/@40.0326269,-86.1349337,149m/data=!3m1!1e3">40.0326269,-86.1349337</a>.</p>

Links

Topics

Stated by source
Civil engineering
Inferred from text
Video 75%
Provenance · 1 source records, 9 field assertions
SourceKeyLast seenRaw
DataCite10.4231/r7542kk014 d agoJSON v1
FieldAssertionExtractorEvidence
access_levelsource · DataCiteconnector:datacite@1.0.0/data/attributes/rightsList
byte_sizesource · DataCiteconnector:datacite@1.0.0
concepts[field].fos:civil-engineeringsource · DataCiteconnector:datacite@1.0.0
concepts[modality].local:modality:videoenrichment · DataCitekeyword-concept-rules@1.0.0title+description (75%)
descriptionsource · DataCiteconnector:datacite@1.0.0/data/attributes/descriptions
licensesource · DataCiteconnector:datacite@1.0.0/data/attributes/rightsList
publication_datesource · DataCiteconnector:datacite@1.0.0/data/attributes/dates
titlesource · DataCiteconnector:datacite@1.0.0/data/attributes/titles/0/title
version_labelsource · DataCiteconnector:datacite@1.0.0