Datasets for lot sizing and scheduling problems in the fruit-based beverage production process

Listed in Teesside University Research Data Repository

Description

The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A., Ferreira, D. , Morabito, R. , Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning” (Toscano, A., Ferreira, D. , Morabito, R. , Flexible Services and Manufacturing Journal) [2], and in “A heuristic approach to optimize the production scheduling of fruit-based beverages” (Toscano et al., Gestão & Produção, 2020) [3].

In fruit-based production processes, there are two production stages: preparation tanks and production lines. This production process has some process-specific characteristics, such as temporal cleanings and synchrony between the two production stages, which make optimized production planning and scheduling even more difficult. In this sense, some papers in the literature have proposed different methods to solve this problem.

Read the rest (5 more)

To the best of our knowledge, there are no standard datasets used by researchers in the literature in order to verify the accuracy and performance of proposed methods or to be a benchmark for other researchers considering this problem. The authors have been using small data sets that do not satisfactorily represent different scenarios of production. Since the demand in the beverage sector is seasonal, a wide range of scenarios enables us to evaluate the effectiveness of the proposed methods in the scientific literature in solving real scenarios of the problem.

The datasets presented here include data based on real data collected from five beverage companies. We presented four datasets that are specifically constructed assuming a scenario of restricted capacity and balanced costs. These dataset is supplementary data for the submitted paper to Data in Brief [4].

[1] Toscano, A., Ferreira, D., Morabito, R., Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings, Computers & Chemical Engineering. 142 (2020) 107038. Doi: 10.1016/j.compchemeng.2020.107038. [2] Toscano, A., Ferreira, D., Morabito, R., A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning, Flexible Services and Manufacturing Journal. 31 (2019) 142-173.

Doi: 10.1007/s10696-017-9303-9. [3] Toscano, A., Ferreira, D., Morabito, R., Trassi, M. V. C., A heuristic approach to optimize the production scheduling of fruit-based beverages. Gestão & Produção, 27(4), e4869, 2020. doi.org/10.1590/0104-530X4869-20.

[4] Piñeros, J., Toscano, A., Ferreira, D., Morabito, R., Datasets for lot sizing and scheduling problems in the fruit-based beverage production process. Data in Brief (2021).

Links

Where it is published

Catalogue records · 1

Topics

Provenance · 1 source records, 6 field assertions
SourceKeyLast seenRaw
Teesside University Research Data Repositoryoai:data.mendeley.com/j2x3gbskfw.122 h agoJSON v1
FieldAssertionExtractorEvidence
access_levelsource · researchdata tees ac ukconnector:researchdata_tees_ac_uk@1.0.0
concepts[field].local:field:earth-environmentalmapping · researchdata tees ac ukconnector:researchdata_tees_ac_uk@1.0.0
descriptionsource · researchdata tees ac ukconnector:researchdata_tees_ac_uk@1.0.0/metadata/dc/description
licensesource · researchdata tees ac ukconnector:researchdata_tees_ac_uk@1.0.0/metadata/dc/rights
publication_datesource · researchdata tees ac ukconnector:researchdata_tees_ac_uk@1.0.0
titlesource · researchdata tees ac ukconnector:researchdata_tees_ac_uk@1.0.0/metadata/dc/title