Constarium
← Search

Data · dataset · 2022

data for Progress of concept design for CFETR diagnostic system

Listed in ScienceDB

Chinese Fusion Engineering Test Reactor (CFETR), is under conceptual design to bridge gaps between ITER and DEMO.

Description

CFETR is envisioned to produce a 200 MW (200 MW in Phase-I and will be increased to 1 GW level) fusion power with tritium breeding ratio (TBR) > 1 and a duty cycle time of approximately 0.3-0.5. This paper is to present the status in the conceptual design of CFETR diagnostic system. Based on the experience obtained in the development of ITER diagnostics and combined with CFETR special requirements, progress of CFETR diagnostic system has been described.

They mainly includes: (1) the conditions and constraints in CFETR environment; (2) one set of proposed measurements and candidate diagnostic techniques for CFETR phase-I. The possible needed R&D activities for future work are under review. Two R&D examples under progress will be introduced.

Links

Where it is published

Catalogue records · 1

Topics

Provenance · 1 source records, 10 field assertions
SourceKeyLast seenRaw
ScienceDB10.57760/sciencedb.033289 d agoJSON v1
FieldAssertionExtractorEvidence
access_levelsource · scidb cnconnector:scidb_cn@1.0.0
concepts[field].local:field:earth-environmentalmapping · scidb cnconnector:scidb_cn@1.0.0
concepts[field].local:field:engineeringmapping · scidb cnconnector:scidb_cn@1.0.0
concepts[field].local:field:humanitiesmapping · scidb cnconnector:scidb_cn@1.0.0
concepts[field].local:field:life-sciencesmapping · scidb cnconnector:scidb_cn@1.0.0
concepts[field].local:field:social-sciencemapping · scidb cnconnector:scidb_cn@1.0.0
descriptionsource · scidb cnconnector:scidb_cn@1.0.0/metadata/dc/description
licensesource · scidb cnconnector:scidb_cn@1.0.0/metadata/dc/rights
publication_datesource · scidb cnconnector:scidb_cn@1.0.0
titlesource · scidb cnconnector:scidb_cn@1.0.0/metadata/dc/title