Structure · dataset · 2018
Direct block scheduling under marketing uncertainties
Listed in DataCite
Description
Abstract
Mineral projects are composed of geological, operational and market uncertainties, and reducing these uncertainties is one of the objectives of engineering. Most surveys assess the impact of geological and operational uncertainties on the mining planning. The objective of this work is to study the impact of market uncertainty on the mineral activity.
Read the rest (2 more)
The influence of iron ore price simulation on mining sequencing will be evaluated. The price of iron ore has random behavior that is best represented by the Geometric Brownian Movement system. This study analyzed the historical series of iron ore in order to determine the percentage volatility and drift.
Traditionally, a constant and deterministic price is used for the ore mined in all periods of a mineral project. The direct block scheduling methodology was adopted because it is able to apply the appropriate financial discount factor to the simulated probabilistic price. The proposed methodology was able to quantify the market uncertainty.
Links
Where it is published
- Repository landing page scielo.figshare.com/articles/dataset/Direct_block_scheduling_under_marketing_uncer… ↗
landing page · from DataCite
- DOI doi.org/10.6084/m9.figshare.6152375 ↗
DOI / persistent id · from DataCite
Documentation and papers
- Creative Commons Attribution 4.0 International creativecommons.org/licenses/by/4.0/legalcode ↗
license · from DataCite
- IsSupplementTo 10.1590/0370-44672017710128 doi.org/10.1590/0370-44672017710128 ↗
publication · from DataCite
Catalogue records · 2
- DataCite API api.datacite.org/dois/10.6084/m9.figshare.6152375 ↗
metadata API · from DataCite
- DataCite Commons commons.datacite.org/doi.org/10.6084/m9.figshare.6152375 ↗
catalogue entry · from DataCite
Topics
- Stated by source
- Earth and related environmental sciences · Materials engineering · Mechanical engineering
- Inferred from text
- Sequencing 75% · Simulation 75%
Related
- Inverse of same asDirect block scheduling under marketing uncertainties
Provenance · 1 source records, 13 field assertions
| Source | Key | Last seen | Raw |
|---|---|---|---|
| DataCite | 10.6084/m9.figshare.6152375 | 13 d ago | JSON v1 |
| Field | Assertion | Extractor | Evidence |
|---|---|---|---|
| access_level | source · DataCite | connector:datacite@1.0.0 | /data/attributes/rightsList |
| byte_size | source · DataCite | connector:datacite@1.0.0 | |
| concepts[field].fos:earth-and-related-environmental-sciences | source · DataCite | connector:datacite@1.0.0 | |
| concepts[field].fos:materials-engineering | source · DataCite | connector:datacite@1.0.0 | |
| concepts[field].fos:mechanical-engineering | source · DataCite | connector:datacite@1.0.0 | |
| concepts[method].local:method:simulation | enrichment · DataCite | keyword-concept-rules@1.0.0 | title+description (75%) |
| concepts[modality].local:modality:sequencing | enrichment · DataCite | keyword-concept-rules@1.0.0 | title+description (75%) |
| created_date | source · DataCite | connector:datacite@1.0.0 | |
| description | source · DataCite | connector:datacite@1.0.0 | /data/attributes/descriptions |
| license | source · DataCite | connector:datacite@1.0.0 | /data/attributes/rightsList |
| publication_date | source · DataCite | connector:datacite@1.0.0 | /data/attributes/dates |
| title | source · DataCite | connector:datacite@1.0.0 | /data/attributes/titles/0/title |
| updated_date | source · DataCite | connector:datacite@1.0.0 |